Geotub enabled the reconstruction of the foundations of an electricity pylon in San Vito di Leguzzano in an easy and simple way. The pylon was built with a 220/132 kV capacity to supply electricity to the new railway station in Malo, in the province of Vicenza, Veneto.
The semicircular structure of Geotub and the easy locking of its 2 shells with handles, made Geotub the ideal solution, as the presence of the pylon did not allow formwork installation from above.
In addition, Geotub provided other benefits including: